Sink and Cooktop Cutouts and the Final Hookup Day

The cutout does one job: it makes a clean opening so a sink or a cooktop sits in the stone without rocking, and every teardown temecula countertop installation seagulls fly has logged shows the same thing about sloppy openings. In a Temecula, CA kitchen the countertop is not finished until the last cutout fits its appliance.
The sink cutout

An undermount sink hangs below the stone, so the cutout edge is exposed and polished. The opening is drawn from the template and the actual sink. The reveal, the small ledge of sink rim visible below the stone, is set during the layout. A positive reveal shows a little rim, a negative reveal hides it, and a flush one lines up. The shop cuts the opening, polishes the inside edge, and drills holes for the faucet.
The cooktop cutout

A drop-in cooktop sits on the stone with a lip. The opening is smaller than the lip and larger than the body, and the clearances to the wall and the cabinet front come from the appliance sheet. A slide-in range needs no cutout, only the right depth. The corners of every cutout are rounded, never square, because a sharp inside corner is where a crack starts in granite or quartzite.
Why plumbing and gas come after
The stone goes on first, then the sink is clipped under it and the plumber connects the supply and drain. Gas for a cooktop is connected by a licensed person after the stone is bonded. Doing it earlier risks a heavy slab landing on a line. Adhesive under the sink rim also needs time to cure before the weight of a full bowl of water is added.
Backsplash gap and caulk
Where the stone meets the wall, a thin gap is left, then filled with a flexible caulk that matches the stone. A tiled backsplash goes in after the top is set, so the tile setter has a flat edge to work to. A narrow stone backsplash may be bonded on the same day with adhesive. Walls in tract houses are rarely straight, and caulk hides the difference.
The final walkthrough
When the last piece is set the crew checks each seam by eye and by hand, looks at the overhang for rocking, runs a straight edge across the top to confirm leveling, and wipes the stone clean. The homeowner is shown where each cutout and seam sits, and any chipped edge gets fixed on the spot with matching resin. Water is run into the sink once the plumber is done, to see the drain and the seal.
A stone top needs a day before heavy loads. Nothing hot or heavy goes on it until the adhesive has cured, and a cooktop in a Riverside County kitchen on a hot afternoon is no exception.